Resume Company – The Internet’s Very Best
The Following Text Is An Unformatted Professional Resume Sample
From The Writers At Resumes Guaranteed


ORDER YOUR OWN LETTER-PERFECT, JOB-WINNING RESUME AND IT WILL BE COMPLETED AS SOON AS YOU NEED!
Click HERE!



Yyyyyy x. yyyyyy

0000 xxxxxx xxxx , xxxx , xxxxx 00000

Phone: (xxx-xxx-xxxx

abc@xyz.com

 

Dedicated Mechanical Engineer eager to contribute exceptional project management, quality control, and team leadership expertise toward supporting a dynamic employer in optimizing performance and productivity.   

 

Profile

 

         Offering 25+ years of experience in mechanical project execution and maintenance in cement industry, oil refineries, gas plants, steel plants and power plants.

         Adept at cement plant erection, commissioning, and maintenance.

         Extensive experience in structural steel erection (i.e. cement plant pre-heater tower, raw mill structures, steel plant storage furnace feed bunkers and supporting steel, pipe racks for oil refineries, gas plants  and power plants, steel for sulfur recovery plants, and ethylene plants).

         Substantial skills in equipment erection including heaters, heat exchangers, reactors, condensers,  pumps, coolers, boilers, turbines, storage tanks, kiln, gas condition towers, cyclones, hoppers, bins, etc.

         Adhere to ASME codes and project specifications in fabricating and installing pipe and pipe supports.

         Excel in project status monitoring, cost control, team leadership, safety compliance, and quality control.

         Significant experience in directing painting and thermal insulation activities as well as full-scope refractory installation.

         MSHA Certified Miner and Approved QC Inspector.

         Proficient in devising major shutdowns schedules, organizing manpower, allocating equipment, conducting comprehensive inspections,  and facilitating final box-up.

 

Professional Experience

 

FLSmidth, Inc., 2008 to Present

Field  Installation  Engineer

         Integral team member in 3500 TPD Kiln line modernization of Keystone Cements at Bath, Pennsylvania through Peck Technical Services, Pittsburgh, Pennsylvania.

         Install rotary kiln rotax-2 (4.35 X 56.0 long), multi-movable cooler (MMC 11 X 73 w Mid HRB), 5-Stage SLC-D Calcining System, exhaust gas condition tower and bypass gas condition tower.

         Demonstrate keen attention to detail and efficiency in performing installation of bag houses for bypass system and cooler, process fans, interconnecting process ducts, feed chutes, de-dusting ducts, and hydraulic pipes and tubes for cooler and HRB.

         Coordinate and install piping for cooling water to kiln, cooler level indicators, and fan bearings.

 

Bechtel-Technip Joint Venture (EPC Contract), 2006 to 2007

Painting/Insulation & Refractory QC Inspector

  • Performed broad-based project functions as member of Khursaniyah Gas plant initiative for Saudi Aramco in Eastern province of Saudi Arabia.
  • Inspected pipes and structural steel painting, thermal insulation, and refractory installation of reactors, condensers, reaction furnace, heaters, thermal oxidizer and stack in sulfur recovery project.

 

Technip  (EPC Contract), 2003 to 2006

Painting/Insulation & Refractory Supervisor

  • Supervised painting, insulation and refractory installation at Berri Gas plant project for Saudi Aramco.
  • Seamlessly coordinated pipe erection groups, steered consistent compliance with Saudi Aramco standards, and oversaw client correspondence and liquidation of punch items.

 

Continued ►

 

 

Yyyyyy x. yyyyyy ~ Page 2 of 3

 

Professional Experience continued

 

Consolidated Contractors Company, 2003

Piping  Supervisor 

  • Expeditiously prepared fabrication schedules and coordinated pipe installation for Qatar fertilizer company revamping project in Qatar.

 

Mid East Constructors, 2002 to 2003

Mechanical Superintendent

  • Proficiently prepared pipe and pipe supports fabrication and installation schedules for plant modernization/QGPC expansion project at Dukhan in Qatar.
  • Formulated structural steel and mechanical equipment installation schedules, compiled daily and weekly reports, conducted post-weld heat treatment, performed blasting, painting and thermal insulation, and allocated heavy erection equipment.

 

Mecon-National Kharafi joint venture, 2001 to 2002

Mechanical Superintendent  

  • Spearheaded plant modernization project including additional sulfur recovery unit with new stack, new pipe racks, one sulfur storage tank, one fire water tank and pipes, and steel structures for Qatar gas (QGPC) expansion project at Ras-Laffan in Qatar.
  • Held accountability for preparing pipe and pipe supports, pipe spool tracking, structural steel and mechanical equipment installation schedule, and coordination with NDT.
  • Exercised sharp multi-tasking expertise to facilitate heat treatment of welds (PWHT), blasting and painting, thermal insulation, and supervision of fabrication and erection of Glycol dye Amine Storage tanks.
  • Directed and supervised safe, compliant and efficient refractory installation on tail gas incinerator.

 

Fabtech C Murray & Roberts  joint  venture, 1999 to 2001

Project  Engineer

  • Installed 5-stage pre-heater structural steel floors, exhaust gas condition tower and its supporting structural steel, process fans, ducts, and chutes for 3000 TPD Kiln line modernization of Kuwait Cement at Shouiba. 

         Championed on-time installation of Ship Unloader (MVT) with 1.6 miles of belt conveyor and transfer towers, stacker and reclaimer (BEUMER) with belt conveyors, and deep bucket conveyor from cooler to Clinker Silo.

 

Merz  and  McLean  Consulting  Engineers, 1996 to 1999

Mechanical  Inspector  

  • Meticulously inspected incoming raw materials and fabricated components for 8X300 MW power project at Shabiya, Kuwait comprised of 8nos. Mitsubishi re-cycle boilers, 8nos. Mitsubishi steam generators, 6nos. fuel storage tanks, 6nos. make up water tanks, pump house, comprehensive steel structure, and pipe racks.
  • Steered quality assurance of pipe fit ups, welding, steel structures, and pump alignments.

         Compiled reports and punch list as per MEW (Ministry of Electricity and Water) specifications.

 

Prior Background:

 

Piping Supervisor, Al-Suwaidi  Est., 1995 to 1996

Mechanical Supervisor, Al Jalhami Trading and Contracting Est, 1993 to 1994

Project  Engineer, Petron  Engineering  Construction Ltd., 1985 to 1993

 

Continued ►

 

 

Yyyyyy x. yyyyyy ~ Page 3 of 3

 

Education

 

University of Kerala C State Board of Technical Education, Kerala, India

         Diploma in Mechanical Engineering

         Junior Technical School Certificate in Welding

 

Professional Development / Specialized Training

 

Merz and McLellan Consulting Engineers:

         Procedure and Drawing Approvals

         Surveillance inspection

         Construction problems

         Non destructive testing  (introduction, defect definition, spectrographic testing, hardness testing, and MPI and DPI techniques)

         Operator approvals

         Post-weld heat treatment

 

NACE Coating Inspector Level 1 and 2, NACE International

 

Certified Welding Inspector, American Welding Society

 

Affiliations

 

Member  of American Welding Society (AWS)

<< Previous           Back to Sitemap           Next >>

Remember: Hire Us To Write YOUR New Resume
And We GUARANTEE That If You’re Not Working In 60 Days Or Less,
We’ll Revise Your Resume, Refund Your Money,
AND Give You $50 EXTRA!

Click HERE!