Resume Company – The Internet’s Very Best
The Following Text Is An Unformatted Professional Resume Sample
From The Writers At Resumes Guaranteed
ORDER YOUR OWN LETTER-PERFECT, JOB-WINNING RESUME AND IT WILL BE COMPLETED AS SOON AS YOU NEED!
Click HERE!
Yyyyyy x. yyyyyy
0000 xxxxxx xxxx , xxxx , xxxxx 00000
Phone: (xxx-xxx-xxxx
abc@xyz.com
Dedicated Mechanical Engineer eager to contribute exceptional project management, quality control, and team leadership expertise toward supporting a dynamic employer in optimizing performance and productivity.
Profile
Offering 25+ years of experience in mechanical project execution and maintenance in cement industry, oil refineries, gas plants, steel plants and power plants.
Adept at cement plant erection, commissioning, and maintenance.
Extensive experience in structural steel erection (i.e. cement plant pre-heater tower, raw mill structures, steel plant storage furnace feed bunkers and supporting steel, pipe racks for oil refineries, gas plants and power plants, steel for sulfur recovery plants, and ethylene plants).
Substantial skills in equipment erection including heaters, heat exchangers, reactors, condensers, pumps, coolers, boilers, turbines, storage tanks, kiln, gas condition towers, cyclones, hoppers, bins, etc.
Adhere to ASME codes and project specifications in fabricating and installing pipe and pipe supports.
Excel in project status monitoring, cost control, team leadership, safety compliance, and quality control.
Significant experience in directing painting and thermal insulation activities as well as full-scope refractory installation.
MSHA Certified Miner and Approved QC Inspector.
Proficient in devising major shutdowns schedules, organizing manpower, allocating equipment, conducting comprehensive inspections, and facilitating final box-up.
Professional Experience
FLSmidth, Inc., 2008 to Present
Field Installation Engineer
Integral team member in 3500 TPD Kiln line modernization of Keystone Cements at Bath, Pennsylvania through Peck Technical Services, Pittsburgh, Pennsylvania.
Install rotary kiln rotax-2 (4.35 X 56.0 long), multi-movable cooler (MMC 11 X 73 w Mid HRB), 5-Stage SLC-D Calcining System, exhaust gas condition tower and bypass gas condition tower.
Demonstrate keen attention to detail and efficiency in performing installation of bag houses for bypass system and cooler, process fans, interconnecting process ducts, feed chutes, de-dusting ducts, and hydraulic pipes and tubes for cooler and HRB.
Coordinate and install piping for cooling water to kiln, cooler level indicators, and fan bearings.
Bechtel-Technip Joint Venture (EPC Contract), 2006 to 2007
Painting/Insulation & Refractory QC Inspector
- Performed broad-based project functions as member of Khursaniyah Gas plant initiative for Saudi Aramco in Eastern province of Saudi Arabia.
- Inspected pipes and structural steel painting, thermal insulation, and refractory installation of reactors, condensers, reaction furnace, heaters, thermal oxidizer and stack in sulfur recovery project.
Technip (EPC Contract), 2003 to 2006
Painting/Insulation & Refractory Supervisor
- Supervised painting, insulation and refractory installation at Berri Gas plant project for Saudi Aramco.
- Seamlessly coordinated pipe erection groups, steered consistent compliance with Saudi Aramco standards, and oversaw client correspondence and liquidation of punch items.
Continued ►
Yyyyyy x. yyyyyy ~ Page 2 of 3
Professional Experience continued
Consolidated Contractors Company, 2003
Piping Supervisor
- Expeditiously prepared fabrication schedules and coordinated pipe installation for Qatar fertilizer company revamping project in Qatar.
Mid East Constructors, 2002 to 2003
Mechanical Superintendent
- Proficiently prepared pipe and pipe supports fabrication and installation schedules for plant modernization/QGPC expansion project at Dukhan in Qatar.
- Formulated structural steel and mechanical equipment installation schedules, compiled daily and weekly reports, conducted post-weld heat treatment, performed blasting, painting and thermal insulation, and allocated heavy erection equipment.
Mecon-National Kharafi joint venture, 2001 to 2002
Mechanical Superintendent
- Spearheaded plant modernization project including additional sulfur recovery unit with new stack, new pipe racks, one sulfur storage tank, one fire water tank and pipes, and steel structures for Qatar gas (QGPC) expansion project at Ras-Laffan in Qatar.
- Held accountability for preparing pipe and pipe supports, pipe spool tracking, structural steel and mechanical equipment installation schedule, and coordination with NDT.
- Exercised sharp multi-tasking expertise to facilitate heat treatment of welds (PWHT), blasting and painting, thermal insulation, and supervision of fabrication and erection of Glycol dye Amine Storage tanks.
- Directed and supervised safe, compliant and efficient refractory installation on tail gas incinerator.
Fabtech C Murray & Roberts joint venture, 1999 to 2001
Project Engineer
- Installed 5-stage pre-heater structural steel floors, exhaust gas condition tower and its supporting structural steel, process fans, ducts, and chutes for 3000 TPD Kiln line modernization of Kuwait Cement at Shouiba.
Championed on-time installation of Ship Unloader (MVT) with 1.6 miles of belt conveyor and transfer towers, stacker and reclaimer (BEUMER) with belt conveyors, and deep bucket conveyor from cooler to Clinker Silo.
Merz and McLean Consulting Engineers, 1996 to 1999
Mechanical Inspector
- Meticulously inspected incoming raw materials and fabricated components for 8X300 MW power project at Shabiya, Kuwait comprised of 8nos. Mitsubishi re-cycle boilers, 8nos. Mitsubishi steam generators, 6nos. fuel storage tanks, 6nos. make up water tanks, pump house, comprehensive steel structure, and pipe racks.
- Steered quality assurance of pipe fit ups, welding, steel structures, and pump alignments.
Compiled reports and punch list as per MEW (Ministry of Electricity and Water) specifications.
Prior Background:
Piping Supervisor, Al-Suwaidi Est., 1995 to 1996
Mechanical Supervisor, Al Jalhami Trading and Contracting Est, 1993 to 1994
Project Engineer, Petron Engineering Construction Ltd., 1985 to 1993
Continued ►
Yyyyyy x. yyyyyy ~ Page 3 of 3
Education
University of Kerala C State Board of Technical Education, Kerala, India
Diploma in Mechanical Engineering
Junior Technical School Certificate in Welding
Professional Development / Specialized Training
Merz and McLellan Consulting Engineers:
Procedure and Drawing Approvals
Surveillance inspection
Construction problems
Non destructive testing (introduction, defect definition, spectrographic testing, hardness testing, and MPI and DPI techniques)
Operator approvals
Post-weld heat treatment
NACE Coating Inspector Level 1 and 2, NACE International
Certified Welding Inspector, American Welding Society
Affiliations
Member of American Welding Society (AWS)
<< Previous Back to Sitemap Next >>
Remember: Hire Us To Write YOUR New Resume
And We GUARANTEE That If You’re Not Working In 60 Days Or Less,
We’ll Revise Your Resume, Refund Your Money,
AND Give You $50 EXTRA!